A safe work method statement (SWMS) is a document for high risk construction work. It sets out the work activities, the hazards they could cause and how the business doing the work will control the risks. Under Australia’s model work health and safety laws, a business carrying out high risk construction work must prepare one before the work starts.
Safe Work Australia says a business that carries out high risk construction work has additional duties. They include to “prepare, keep, comply with and review” a SWMS.
Its list of high risk construction work includes:
- work with a risk of a person falling more than two metres
- demolition of a load-bearing structure
- disturbing asbestos
- work in or near a confined space
- work near energised electrical installations
- work on or near traffic
- work where powered mobile plant moves
For a facilities or property team, ask for the SWMS for each job on that list before work starts. Safe Work Australia notes its tool is based on the model laws. State or territory laws may differ, so check with the local regulator.
Related terms: Trade licence · Principal contractor · Public liability insurance
Sources
- Interactive SWMS tool (published 25 January 2024) · Safe Work Australia · read
General information, not legal, insurance or compliance advice. Updated .