What a principal usually collects from its trades
Most facilities and property teams ask each contractor for the same four things before work starts, and again whenever one expires. Sign up from this page and the workspace opens with these four as editable starting requirements:
- Public liability certificate of currency, with the minimum limit your contracts require: a lower limit can’t be accepted without an exception your reviewer records.
- Workers compensation certificate of currency, or the contractor’s reply that it has no workers and holds no policy.
- Trade or contractor licence, for the work the trade does for you, with its number, class and expiry date.
- Contractor safety declaration, a short set of questions the contractor answers and signs, with its safe work method statement attached where the work needs one.
What regulators and registers say
Contracts usually set the insurance a trade must hold. Licences and safety plans also come from the rules where the work is done. Three Australian examples, each quoted from its source:
- Safety plans (New South Wales)
- SafeWork NSW says a business “is required to have a SWMS prepared for high risk construction work before that work commences”, and gives “work that involves a risk of a person falling more than two metres” as an example. Source: SafeWork NSW, Prepare safe work method statement, no date shown; read 15 November 2026.
- Trade licences (New South Wales)
- Service NSW says a licence is needed for “residential building work, wiring, plumbing, draining, gasfitting, air conditioning or refrigeration work”, and offers a public check of a builder’s or tradesperson’s licence before work starts. Source: Service NSW, Check a builder or tradesperson licence, last published 15 August 2025; read 15 November 2026.
- Trade licences (Queensland)
- The Queensland Building and Construction Commission says: “For plumbing, drainage, gas fitting or fire protection work, a QBCC licence is required regardless of the value.” Its licensee register shows each contractor’s licence history. Source: QBCC, Find a licensed contractor, last reviewed 12 December 2025; read 15 November 2026.
General information, not legal advice: the rules differ by state, territory and country, and by the kind of work.
Free for your contractors
Each trade sends its documents through a private link, and a code sent to its own email address opens anything already sent. Contractors need no account, pay nothing and don’t count as team members, so the same electrician can answer every manager who asks without signing up for anything.
Reminders before the next job
An accepted certificate keeps a requirement current until its expiry or review date. Once an Owner or Admin turns on automatic reminders, the standard schedule emails the contractor 30, 14, 7 and 1 days before expiry, and stops while a replacement waits for review. SMS reminders can go with email reminders to mobile numbers in Australia, once an Owner or Admin turns SMS on. New Zealand, the United Kingdom, the United States and Canada follow once each is approved.
Where your data is stored, and how billing works
The app and its database run on a server in Kuala Lumpur, Malaysia. Uploaded documents are stored, encrypted, in the eastern United States. Your data is not kept only in your own country. Plans are priced and billed in US dollars, plus any applicable tax. Where each provider stores data and what each plan costs are on their own pages.
What Vendarity does not do
- Check a licence register, or confirm cover with an insurer. Your reviewer checks what each document shows, and the registers above are where a licence is confirmed.
- Decide which licence, cover or safety plan a job needs. Your contracts and the rules where the work is done decide that.
- Book jobs, pay contractors or manage work orders.
Free for up to 25 suppliers. No card needed.